Crystal Springs-San Andreas Transmission Upgrade
Project Date: 2011 - Active Project

Heavy underwater construction involving "Cast in Place Underwater Concrete", Underwater Pipe Installation, Grouting and installation of structural steel and fish screens.  (More)
 
Cheesman Dam - High Altitude/Deep Dive
Project Date: 2008

Mixed gas diving gear, multiple hyperbaric chambers, barges, multiple cranes and other equipment were mobilized to a remote, high mountain lake in Colorado. The work scope included cutting away...  (More)
 
King County Outfall/Mixed Gas Diving
Project Date: 2007

Our team provided a 90 foot Dive Support Vessel, mixed gas diving gear, multiple hyperbaric systems, remotely operated vehicles, sonar and other equipment to perform underwater work...  (More)
 
Lake Mead Intake Tunnel - Vegas
Project Date: 2011 - Active Project

BDHs was awarded the hyperbaric support work for the tunneling operation at the Lake Mead No. 3 Intake project. This is a unique project due to the extraordinary pressures at the tunnel boring machine head. The extreme pressures require a high tech diving mode called Saturation. BDHs Project Solutions are discussed in the following expanded section...  (More)
 
Cruise Ship Anchor Recovery
Project Date: 2010

Responding to a Cruise Ship operator who lost an anchor in over 200’ in Alaskan waters, with limited coordinates. In less than 24 hours we mobilized an eight man dive team, a full mixed gas diving suite, a side scan sonar system and an inspection class ROV to the site in Sitka Alaska.  (More)
 